I’m ready to start overhead documenting of the (eventual) building process. First, here’s an indication of where the natural swimming pond will be placed.

One of may be the last evenings in the barn, powered by battery lights:

We are waiting for the outcome of the tender process and the inevitable trying to shave off (more than shave off) some of the builder’s estimated costs before drawing up a contract and waiting for them to start. Presumably they will demolish and then do some extensive groundwork, including, possibly getting a company in to drill a borehole. But I am getting ahead of myself.
Leave a Reply